Featured Projects

Lakeside @ Loudon Tech Center
Ashburn Crossroads
Bowie Corporate Center
FASEB
Heritage Hunt Office Condos
Heritage Hunt Professional Bldg
Logicon Office Building
Pan Am Flight Simulator Building
Ridgeview
Twelve Oaks
Westat III
1411 K Street
 
 

 

Westat III

 

This 221,400 square foot - 8 story office building includes a 4 level parking garage and was completed in the fall of 2002.  The structure is a cast-in-place structural concrete frame and the facade is EIFS on a steel stud back-up. The lobby has a dramatic 2-story entrance with polomyx walls and the full height curtainwall system allows for natural light to enter the lobby area.

 

Project Highlights

 
  • Each perimeter office is equipped with an individual console heat pump for individual control.
  • The attractive skywalk gives employees access from existing building to new offices without exiting the building.
  • Decorative precast hanover pavers were installed at the balcony adjacent to the conference center.
  • Constructed in 14 months including complete tenant build-out and skywalk.
 

Project Team

 

Client - Plaza 270 Associates

Architect - Holle & Lin Architects

Civil Engineer - Site Solutions Incorporated

site map   privacy policy