The Lakeside @ Loudoun Tech Center I, II and III was the first project for the newly formed Hubert Construction in June 1998. The three - four story
Class A Office Buildings were each 105,000 sf and included brick veneer on
steel stud back-up with cast stone accents, vertical curtainwall elements and
punched window openings. Complete site preparation including earthwork,
utilities, paving, site concrete, landscaping, stone sculptures and water
features. |